On this page
- What counts as commercial gutter work?
- Which gutter and drain types are used?
- How is commercial drainage sized?
- What about historic commercial buildings?
- What do multi-family communities need?
- What should a commercial proposal include?
- What maintenance schedule suits a community or commercial building?
- How is a commercial gutter job carried out?
- Related pages
What counts as commercial gutter work?
Commercial gutter work is any roof drainage beyond the 5 and 6-inch gutters used on houses: box gutters, scuppers and conductor heads on parapet roofs, large downspouts, and long runs on apartment, condominium and townhome buildings. Old Town Gutter Works connects callers with independent local gutter contractors, who give the estimates and do the work, including those who take on commercial buildings.
Typical buildings in and around Alexandria:
- Shops, restaurants and offices, including historic storefronts on King Street and Mount Vernon Avenue
- Churches, schools and community buildings
- Garden apartment and condominium communities
- Townhome associations
- Warehouses and flex buildings
Which gutter and drain types are used?
| Component | Where it is used | Notes for Alexandria |
|---|---|---|
| Box gutter, 6 to 8 inch or larger | Eaves of commercial and institutional buildings | Sized for high-intensity rain; expansion joints on long runs |
| Built-in gutter | Behind the cornice of older masonry buildings | Metal or membrane lining; leaks show inside the wall |
| Scupper and conductor head | Parapet walls on flat roofs | Overflow scuppers above the primary ones |
| Internal roof drain | Flat membrane roofs | Strainers kept clear of leaves |
| 4x5 or 4 to 6-inch round downspout | Below box gutters and conductor heads | Cast-iron or protected boots at sidewalk level |
| 7 or 8-inch K-style | Large pitched roofs, multi-family | Seamless in long runs |
How is commercial drainage sized?
By the roof area draining to each outlet and the rainfall intensity the system is designed for, following the plumbing code and industry manuals. Three points matter to an owner:
- Outlets set the capacity. A wide gutter with too few downspouts still overflows.
- Overflow is not optional. A flat roof needs a second way out for water if the primary drain blocks.
- Design for the short storm. Alexandria's recent floods were hour-long events: 3 to 5 inches in a little over an hour in August 2021.
What about historic commercial buildings?
Many storefronts in Old Town stand inside the Old and Historic Alexandria District, and those near the Braddock Road area may fall in the Parker-Gray District. The city's roofing guidelines list gutters and downspouts as needing no Board of Architectural Review approval and recommend metal or wood, finished to match the wall or trim. Other roof and cornice work can need review, so call preservation staff before altering a built-in gutter or cornice. See gutters on historic Alexandria homes.
What do multi-family communities need?
Alexandria and its neighbors have a great deal of shared housing, from wartime garden apartments such as Parkfairfax, with 1,684 units in more than 200 buildings, to planned communities such as Kingstowne. The common faults are long runs with too few downspouts, downspouts emptying onto walkways, and no clear schedule. A maintenance contract that sets two cleans a year and a written condition report with photos solves most of it.
What should a commercial proposal include?
- A marked-up roof plan showing every gutter, outlet and downspout
- Material, gauge, finish and profile
- Bracket or hanger type and spacing, and expansion provisions
- Access method, sidewalk protection and working hours
- Virginia contractor license number and class, and proof of insurance
- Warranty terms
- Price, payment schedule and exclusions
What maintenance schedule suits a community or commercial building?
| When | Task |
|---|---|
| Late spring | Clear gutters, scuppers, conductor heads and drain strainers after seed fall |
| Summer | Inspect after each severe storm; confirm overflow routes are open |
| Late fall | Second full clean after leaf drop; test every downspout |
| Winter | Check discharge points for ice on walkways |
| Yearly | Written condition report with photos, building by building |
How is a commercial gutter job carried out?
- Site visit, roof plan and measurements.
- Written proposal with materials, sizes and schedule.
- Access and safety set-up, including sidewalk protection.
- Removal of failed gutter.
- Repair of the substrate.
- Fabrication and installation to a set pitch.
- Downspouts and discharge.
- Water test and hand-over record.
